Call For Help Construction Services
Experience You Can TRUST
Craftsmanship You Can RESPECT
  • Home
  • About Us
    • Insurance
  • Construction Services
    • Indoor >
      • Kitchen Remodels
      • Bathroom Remodels
      • Basement Finish
      • Tile
      • Drywall
      • Hardwood Floors
    • Outdoor >
      • Decks & Deck Restoration
      • Fences
      • Concrete
      • Railings
      • French Drain Design
      • Detached Garages
    • Design / Build
    • Doors & Windows
    • Roof Repair
  • Testimonials
  • Blog
  • Contact Us

Call For Help Independent Contractor Agreement

Thank you for choosing "Call For Help" for your construction project.  By clicking the "I Agree" button below you are agreeing to the terms of this agreement.  
    [object Object]

    For valuable consideration, the owner and contractor (Call for Help - CFH) agree as follows:

    1) The contractor agrees to furnish all of the labor and materials to do the following work for the owner as an independent contractor:

    2) The contractor agrees that the following work will be completed by the dates specified:
    3) The contractor agrees to perform the work in a workmanlike manner according to to standard practices.  If any plans or specifications are part of this job, they are attached to and are part of this agreement.  Attach documents below:​
    Max file size: 20MB
    Max file size: 20MB
    Max file size: 20MB
    Max file size: 20MB
    4) The owner agrees to pay the contractor full payment as indicated below for doing the work outlined above.  The final payment will be paid to the contractor upon satisfactory completion of the work based on the payment schedule outlined below.  
    5) The contractor and the owner may agree to extra services and work, but any such extras must be set out and agreed to in writing by both the contractor and the owner.  

    6) The contractor agrees to indemnify and hold the owner harmless from any claims or liability arising from the contractor's work under this agreement.  

    7) No modification of this agreement will be effective unless it is in writing and is signed by both parties.  The agreement binds and benefits both parties and any successors.  Time is of the essence of this agreement.  This document, including any attachments, is the entire agreement between the parties.  This agreement is governed by the laws of the State of Colorado.

    8) A SCOPE OF WORK will be entered, or attached above, which will provide in great detail what the customer should expect in each phase of the project(s). For example: "repair drywall patch and texture" vs. "in the event the drywall patch is due to water damage,  will remove the damaged drywall, inspect for mold. If additional damage or mold is found, CFH will discuss the unseen damage with the homeowner/agent and a course of actioned will be decided upon by the owner/agent. Drywall will be repaired to match surrounding walls and textured to match as close as possible the existing". The latter example will apply.

    9) All work shall be completed in compliance with all building codes and other applicable laws.

    10) CFH if needed, shall furnish a plan and scale drawing detailing the shape, size, and dimensions for home improvement projects.

    11) To the extent required by law all work shall be performed by individuals duly licensed and authorized to perform said work.

    12) Contractor may at its discretion engage sub-contractors to perform work hereunder, provided Contractor shall fully pay said sub-contractor and in all instances remain responsible for the proper completion of this Contract.

    13) Contractor agrees to remove all debris and leave the premises in broom clean condition.

    14) Contractor warrants it is adequately insured for injury to its employees and others incurring loss or injury as a result of the acts of the Contractor, his employees, or subcontractors.

    15) In the event Owner/Agent shall fail to pay any periodic or installment payment do hereunder, Contractor may cease work without breach pending payment or resolution of any dispute.

    16) All disputes hereunder shall be resolved by binding arbitration in accordance with rules of the American Arbitration Association, in the State of Colorado, city of Colorado Springs, County of El Paso, USA.

    17) Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty or general unavailability of materials.

    18) Contractor warranties all work for a period of 5 (five) years against defects in craftsmanship.
I Agree
Call For Help Now!  719-930-7040
Call For Help Construction Services
Colorado Springs  CO 
Contract | Privacy Policy | Contact Us
Picture
Picture
Picture
Rated & Reviewed HomeAdvisor Pro
Approved Colorado Handyman Services
Colorado Springs Top Rated Pro - Call for Help Construction Services
Top Pro in Colorado Springs

We happily accept:
Picture